Divider Line
TDV Logo
TDV Consulting GmbH
Dorian Janjic & Partner - Graz, Austria
Divider Line


References

WEH Bridge India

TDV was approached by iBilt Technologies of New Delhi, India, to assist in this project.

Western Express Highway (WEH) bridge, part of Versova-Andheri-Ghatkopar (VAG) corridor of Mass Rapid Transit System (MRTS) in India, is an extradosed railway bridge with harp stay cable arrangement. The bridge has the two pylons and a total length of 175 m. The main span is 83 m long. The bridge will be built using the balanced cantilevering method.


WEH Bridge, Construction Procedure


  • Contract:
    • Western Express Highway (WEH) Bridge, India
  • Owner:
    • Mumbai Metropolitan Region Development Authority, India
  • Consultant:
    • iBilt Technologies Ltd., New Delhi, India
  • State of Construction:
    • On Standby
  • TDV Involvement:
    • Structural modelling
    • Cable stressing optimization
    • Construction stage calculation
    • Prestressing profile

    Divider Line TDV Consulting GmbH
    Dorian Janjic & Partner

    A-8010 Graz, Austria
    Divider Line