![]() |
||||
|
||||
![]() |
ReferencesPrestressed concrete bridge with four spans (142 m + 250 m + 162 m + 77 m). Calculation with non-linear geometry and non-linear material behaviour due to piers with 130 m height. Built using the balanced cantilevering method.
![]() Dorian Janjic & Partner A-8010 Graz, Austria ![]() |