Divider Line
TDV Logo
TDV Consulting GmbH
Dorian Janjic & Partner - Graz, Austria
Divider Line


References

Donaubrücke Pöchlarn Austria

Prestressed concrete bridge with five spans (72.5 + 3 x 105 + 72.5 = 460 m). Built using the balanced cantilevering method.

Project Engineer: Dipl.-Ing. POPPER - MAGYAR, Vienna, Austria.

Divider Line TDV Consulting GmbH
Dorian Janjic & Partner

A-8010 Graz, Austria
Divider Line