![]() |
||||
|
||||
![]() |
References
Machang Bridge
Korea
TDV was approached by Hyundai Engineering of Seoul, Korea, to assist in this important project.
![]() Machang Bridge, Korea The construction of cable-stayed Machang Bridge was completed in 2008. The bridge provides a link across Masan Bay between the cities of Masan and Changwon, shortening commuting time by 30 min. The total length of the bridge is 740m, with a main span of 400m, side spans of 175m and two H-shaped pylons 164m high. The bridge deck is composite, consisting of concrete slab on steel plate girders.
|