Divider Line
TDV Logo
TDV Consulting GmbH
Dorian Janjic & Partner - Graz, Austria
Divider Line


References

Talübergang P19 Austria

Prestressed concrete bridge in Lavant with total length of 780 m over six spans (74 m + 146 m + 160 m + 160 m + 155 m + 85 m). Calculation with non-linear geometry and non-linear material behaviour due to piers with 150 m height. Built using the balanced cantilevering method.

Project Engineer: Dipl.-Ing. POPPER - MAGYAR, Wien, Austria.

Divider Line TDV Consulting GmbH
Dorian Janjic & Partner

A-8010 Graz, Austria
Divider Line