Divider Line
TDV Logo
TDV Consulting GmbH
Dorian Janjic & Partner - Graz, Austria
Divider Line


References



18 Tunnels on Main roads Bosnia and Herzegovina






Tunnel Design of 10 Standard Tunnels

Geological and geomechanical investigation works, final design of Mušici tunnel on primary route M-05.0, section Izacic - Bihac, 195 m length.
Client: P.C. Road directorate of FBiH; Date: 2010.


Design of four tunnels on highway Zenica - Sarajevo - Mostar, section Lepenica - Tarcin:

  • Tunnel Zakunjaca, L = 368 + 361 m (two tubes);
  • Tunnel Grabosjec, L = 832 + 888 m (two tubes);
  • Tunnel Suhodol, L = 2801 + 2745 m (two tubes);
  • Tunnel Tarcin, L = 437 + 382 m (two tubes).
Client: FEDA; Year: 2009 - 2010.


Geological and geomechanical investigation works, final design of Vijenac tunnel on highway Zenica - Sarajevo, section Drivuša - Bilješevo, 2950 m length.
Client: FEDA; Date: 2007 - 2008.


Geological and geomechanical investigation works, hydrological and geodetic data base and final design of three tunnels on main road M-18.0, section Podpaklenik – Olovo:

  • Tunnel Bjelava, L = 115 m;
  • Tunnel Kladušnica, L = 170 m;
  • Tunnel StupcanicaTarcin, L = 90 m.
Client: P.C. Road directorate of FBiH; Contract duration: 25.12.2006 to 25.04.2007.


Geological and geomechanical investigation works, final design of Bocac tunnel on primary route M-16.0, section Banja Luka - Jajce, 106 m length.
Client: P.C. Road directorate of FBiH; Date: 2000.

Top





Tunnel Rehabilitation Design of 7 Standard Tunnels

Investigation works and final design of renewal of Vranduk tunnel on primary route M-17.0, Doboj - Zenica, 1060 m length.
Client: P.C. Road directorate of FBiH; Date: 2010.


Investigation works and final design of renewal of four tunnels near Jajce on primary route M-16.0, Banja Luka – Jajce:

  • Tunnel no. 6, L = 78 m;
  • Tunnel no. 7, L = 36 m;
  • Tunnel no. 8, L = 61 m;
  • Tunnel no. 9, L = 120 m.
Client: P.C. Road directorate of FBiH; Contract duration: 28.07.2006 to 28.10.2006.


Investigation works, preliminary and final design of Crnaja tunnel rehabilitation, on the main road M-17, Sarajevo – Jablanica section, 550 m length.
Client: SFOR and FBiH Roads Directorate; Contract duration: 03.09.2003 to 03.12.2003.


Investigation works, preliminary and final design of Kupreška vrata tunnel rehabilitation, on the main road M-16, Bugojno – Kupres Section, 350 m length.
Client: SFOR and FBiH Roads Directorate; Contract duration: 03.09.2003 to 03.12.2003.

Top





Tunnel Site Supervision of 2 Standard Tunnels

Technical supervision over execution of rehabilitation works at tunnel “Kupreška vrata” on main road M-16.0, section Bugojno – Kupres.
Client: P.C. Road directorate of FBiH and EUFOR; Contract duration: 25.06.2005 to 15.12.2005.


Technical supervision over execution of rehabilitation works at tunnel “Crnaja” on main road M-17.0, section Konjic – Jablanica.
Client: P.C. Road directorate of FBiH and EUFOR; Contract duration: 25.07.2005 to 15.11.2005.

Top




Divider Line TDV Consulting GmbH
Dorian Janjic & Partner

A-8010 Graz, Austria
Divider Line