ReferencesGround Stabilization and Rockfall Protection Structures
Bosnia and Herzegovina ![]() Ground Structures Design Final design and technical supervision over rehabilitation of rockslide “Hotonj” on main road M-18.0, section Vogošca – Sarajevo at km 113+400.
Investigation work and final design of landslides:
Final design of stabilization of landslide at main road M-16, section: Banja Luka – Jajce, km 58+500.
Final design of land slip stabilization on the main road M-16 at km 19 from the interchange in Jajce, section Banja Luka – Jajce.
Final design of road embankment in Gora on main road M-18.
Preliminary and final design of gallery on the main road M-17 Jablanica – Mostar, Prenjska Vrata section, L=44.0 m (reinforced concrete).
Final design of stabilization of “Gradac” land slope on main road M-17 in Hadžici.
Final design of stabilization of land slope on regional road R-448, section Gorazde – Praca.
Final design of stabilization of “Komadinovo Vrelo” slope on main road M 17, section Jablanica – Mostar.
Final design of landslide “Coralici”, rockslides “Ostrožac” and “Skokovi” near Cazina and rockslide “Užljebic” on main road M-11 improvement.
Final design of stabilization of “Ovcari” slope on main road M-17 near Konjic.
Final design of stabilization of “Bukva” landslide on main road M-14.1 near Gradacac.
Ground Structures Rehabilitation Design Final design of improvement of landslide conditions, location “Stanovi”, main road M-18, section Šicki Brod – Kladanja.
Final design of landslide Barice improvement, as part of design for completing Zenica – Sarajevo highway, section Podlugovi – Jošanica.
Final design of rectifying a curve (black spot) on main road M-14, section Bihac – Bosanska Krupa and final designs of rectifying two curves (black spots) on main road M-5, section Izacic – Bihac, km 1+880 and km 2+660.
Final design of improvement of landslide conditions, location “Stupari 1” and location “Stupari 2” on main road M-18, section Šicki Brod – Kladanj.
Final design of improvement of landslide conditions, location “Malo jezero”, main road M-5, section Mrkonjic Grad – Jajce.
Final design of improvement of road embankment conditions, location Dubrave Donje, regional road R-469, section Živinice – Medaš.
Final design of repair of four gabion walls on main road M-17, section Doboj – Zenica.
Final design of rehabilitation of unstable terrain on section Bugojno – Kupreška vrata of main road M-16.
Final design of improvement of “Lovacki dom” rockslide near Jablanic, rockslide “Ribica most” near Ostrožac and two rockslides in Ostrožac on main road M-17.
Ground Structures Site Supervision Supervision of works made on improvement of stability conditions on a slope on primary M-5 in valley of River Lašva.
Supervision of the improvement of landslide conditions, location “Stanovi 1”, main road M-18, near Kladanj.
Supervision of road embankment in Gora on main road M-18.
Supervision of improvement of road embankment conditions, location Dubrave Donje, regional road R-469, section Živinice – Medaš.
Supervision of improvement of landslide conditions, location “Stupari 2”, main road M-18, section Šicki Brod – Kladanja.
Supervision of improvement of landslide conditions, location “Stupari 1”, main road M-18, section Šicki Brod – Kladanj.
Supervision of rehabilitation of unstable terrain on section Bugojno – Kupreška vrata of main road M-16.
Supervision of works made on improvement of rockslide “Lovacki dom” near Jablanica, rockslide “Ribica most” and rockslide “Ostrožac II” in Ostrožac, rockslide “Gradac” in Hadžici.
Supervision of Komadinovo Vrelo slope stabilization on main road M-17, section Jablanica – Mostar.