References
3 Incremental Launching Bridges
Serbia
The Main Design of Highway on section: Lot 1.1 from km 108+000 to km 120+000, phase II: from km 115+280 to km 120+000
Bridge at km 26+418 (E-75); Number of spans: 16; Total length: 478.90 m
Scope of work:
- Modelling of numerical model of the bridge;
- Structrual analysis;
- Optimization of tendon geometry;
Date: June 2010
Client: CPV - CENTAR ZA PUTEVE VOJVODINE
Bridge at km 27+114 (E-75); Number of spans: 7; Total length: 162 m
Scope of work:
- Modelling of numerical model of the bridge;
- Structrual analysis;
- Optimization of tendon geometry;
Date: June 2010
Client: CPV - CENTAR ZA PUTEVE VOJVODINE
Bridge at km 26+770 (E-75); Number of spans: 6; Total length: 142.80 m
Scope of work:
- Modelling of numerical model of the bridge;
- Structrual analysis;
- Optimization of tendon geometry;
Date: June 2010
Client: CPV - CENTAR ZA PUTEVE VOJVODINE
TDV Consulting GmbH
Dorian Janjic & Partner
A-8010 Graz, Austria