References
50 Bridges on Highways
Bosnia and Herzegovina
Bridge Design of 24 Standard Bridges
Final design of completion of highway Zenica – Sarajevo, section Bilješevo – Kakanj, subsection Bilješevo (Lucani) – Kakanj, 9.0 km length. Investigation works and designs of three new bridges:
- Bridge across Brook Repovacki, L=18.0 m,
- Bridge across River Bosna, L=112.5 m,
- Bridge across River Bosna, L=197.2 m.
Client: Road directorate of FBiH; Contract duration: 04.07.2007 to 04.07.2008.
Final design of completion of highway Zenica – Sarajevo, section Kakanj – Visoko, 16.5 km length. Investigation works and final design of sixteen new bridges:
- Two bridges across River Bosna (prestressed concrete), L=130 m,
- Overpass across regional road Visoko – Kakanj (reinforced concrete), L=34,
- Two bridges across tributaries of River Bosna (prestressed concrete), L=28 m,
- Nine structures for passage of local roads under the highway (reinforced concrete),
- Pedestrian bridge (steel), L=40 m,
- Overpass across highway for transport of local traffic (reinforced concrete), L=110 m.
Client: Road directorate of FBiH; Contract duration: 13.12.2004 to 16.01.2006.
Final design of completion of highway Zenica – Sarajevo, section Visoko – Podlugovi, length 8.5 km. Investigation works and final design of three new bridges:
- Visoko Intersection (prestressed and reinforced concrete), L=120m;
- Overpass across Sarajevo – Vrhpolje railway (prestressed), L=132m;
- Bridge across River Bosna, regional roads and railways Sarajevo – Vrhpolje, “Cekrcici” (prestressed), L=264m.
Client: FBiH Roads Directorate; Contract duration: 18.09.2002 to 30.06.2003.
Final design of two new objects for underpass of local roads on Zenica – Sarajevo highway, Visoko – Podlugovi section.
Client: FBiH Roads Directorate; Contract duration: 30.03.2003 to 30.06.2003.
Top
Bridge Rehabilitation Design of 26 Standard Bridges
Final design of completion of highway Zenica – Sarajevo, section Bilješevo – Kakanj, section Bilješevo (Lucani) – Kakanj, 9.0 km length. Investigation works and final design of rehabilitation and upgrading (improvement of load bearing capacity) of existing three bridges:
- Bridge across Brook Repovacki, L=18.0 m,
- Bridge across River Bosna, L=112.5 m,
- Bridge across River Bosna, L=197.2 m.
Client: Road directorate of FBiH; Contract duration: 04.07.2007 to 04.07.2008.
Final design of completion of highway Zenica – Sarajevo, section Kakanj, Visoko, 16.5 km length. Investigation works and final design of upgrading, rehabilitation and improvement (increase of load bearing capacity) of existing twelve bridges:
- Interchange Kakanj, L=50 m,
- Two bridges across River Bosna, L=130 m,
- Overpass across regional road Visoko – Kakanj, L=30 m,
- Two bridges across tributaries of River Bosna, L=28 m,
- Six structures for passing of local roads under the highway.
Client: Road directorate of FBiH; Contract duration: 13.12.2004 to 16.01.2006.
Final design of completion of highway Zenica – Sarajevo, section Visoko – Podlugovi, length 8.5 km. Investigation works and final design of extending, reconstructing and strengthening (improving the load bearing class) of the present three bridges (Prestressed):
- Visoko Intersection, L=118 m,
- Overpass across Sarajevo – Vrhpolje railway, L=101 m,
- Bridge across River Bosna, regional roads and railway Sarajevo – Vrhpolje, “Cekrcici”, L=230 m.
Client: FBiH Roads Directorate; Contract duration: 18.09.2002 to 30.06.2003.
Final design of reconstruction of eight prestressed bridges, 1500 m total length, on phase 1 of Zenica – Sarajevo highway, section Podlugovi – Jošanica.
Client: FBiH Roads Directorate – contractor Integra d.o.o. Mostar; Contract duration: 29.03.2002 to 01.07.2002.